Saturday, September 28, 2013

Sep 2013

Photos of Construction work of Champion Care Homes Pvt., Ltd., taken in Sep 2013

30 Sep 2013
View of Western wing Ground and First Floor with shutters as seen from First Floor of Eastern Wing

First floor South wing shutters done

Completing the First floor South wing shutters

View of Southern wing Ground and First Floor with shutters as seen from Ground Floor of Northern Wing

Concreted portions of balconies of First Floor west wing seen on the right

Concreted Columns of First Floor West wing

Concreted Columns of First Floor East wing


View diagonally from NE corner with East wing columns on right and foreground; while shutters of first floor SE corner is seen in background


Concreted Columns of First Floor North wing as seen from east side of NE corner


24 Sep 2013
View of South wing FF shutters as seen from North

FF Columns over North wing

FF Columns over West wing with shutters for FF roof at its south or distal end

East wing concreted GF slab on props

FF Columns on East Wing

FF Columns on West Wing with Balcony GF roof slab shutter on the right


West Wing with Balcony GF roof slab shutters on the right

FF Columns of North Wing in background with workers laying the Balcony GF roof slab shutters in the foreground

FF Columns of East Wing on top with workers laying the Balcony GF roof slab shutters supported by Jacks from the ground

FF roof shutters and GF brick work on the SW corner


View from SW corner of Southern or front face of CCH with laying of shutters on FF

Southern or front face of CCH with laying of shutters on FF as seen from the SE corner



18 Sep 2013
Covering the concreted ramp from First Floor to Landing; before First Floor roof

Laying the Shutters for the Ground Floor roof slab of internal corridor for the East wing

Laying the Balcony roof shutters for the southern-most room on the east wing

View of East wing with GF to FF ramp completed till landing

View of concreted GF roof slab of East wing except for the balcony


Columns for FF roof on the east wing



12  Sep 2013
Shutters being laid for the First Floor roof of the Reception area; as seen from  the western side

Eastern wing GF as seen from South

East wing on the left and South wing on the right; as seen from the West

West Wing GF roof slab as seen from its South end

Brick making in the proposed reception area: Lifting the press

Filling the mould with aggregate


11 Sep 2013
View from the North of the Ground Floor roof slab completed on North, West, and South wings.

View from the NE corner diagonally to the SW corner. The ramp near the service lift is seen on the left



7 Sep 2013
Freshly concreted ground floor roof slab of the western wing


Concreted ground floor roof slab of NE corner in foreground, and incomplete shutter of Eastern wing on the left

North wing on the left with sunken space for toilet in the right foreground

Freshly pressed bricks kept for setting on their wooden boards

Bricks in the courtyard for curing

Ground Floor (GF) Brick work in progress

View of proposed car park area; now with concrete mixer and aggregates


Contact details:
Champion Care Homes Pvt., Ltd.,
V/529 MD's Quarters, Edalakad,
Thabore P.O.,
Pin 683577, Ernakulam District,
Kerala State, India.
Mobile number is +918281345391
Land line is +91 484 2451450
skype: emrafi