Photos of Construction work of
Champion Care Homes Pvt., Ltd., taken in Oct 2013
03 Oct 2013
View of First Floor Western wing shutters taken from the First Floor of the Eastern wing
View of First Floor Western wing shutters taken from the North Western Corner
View of First Floor Western wing shutters taken from the North Western Corner with the Ground floor roof slab also seen
View of First Floor Northern wing columns taken from the North Western Corner with the Ground floor roof slab of balcony also seen on the left
View of First Floor Western wing shutters taken from the North Western Corner with the Ground floor roof slab of balcony also seen on the right
View of First Floor Western wing shutters proximally and concreted portion in distal areas taken from the North Western Corner with the Ground floor roof slab of balcony also seen on the right
View of First Floor Southern wing shutters with the ramp also seen in the centre
Another view of First Floor Southern wing shutters with the ramp also seen in the centre
View of First Floor Reception area Southern wing shutters with the ramp also seen in the left and southern end of the east wing First Floor columns seen on the right
08 Oct 2013
View of concreted First Floor Western wing as seen from the First Floor Eastern Wing
Laying the shutters for the First Floor North wing roof slab
Laying shutters for the ramp from First Floor to Second near the North East Corner
Murthy and Chandran discussing the electrical nuances next to the Service lift near the North East corner on the First Floor.
Against the background of the First Floor Southern wing shutters and the ramp; Murthy and Chandran discuss.
Murthy and Chandran discussing
09 Oct 2013
Murthy enjoying a glass of black tea in the garden of Joby's
Entrance of a Timber Depot and Saw mill at Kalady
11 Sep 2013
View of Northern wing First floor shutters as seen from the Southern wing ground floor
View of Eastern wing First floor columns as seen from the Western wing ground floor
View of Northern wing First floor shutters as seen from the area between the two pools
View of Northern wing First floor shutters as seen from the North-West corner
View of Northern wing First floor shutters as seen from the North-West corner, along with the Ground Floor in the NW corner.
View of Northern wing First floor shutters as seen from the North-West corner, along with the Ground Floor in the NW corner; and without the strip of land on the left.
View of Western wing First floor shutters and concrete as seen from the North-West corner, along with the Ground Floor towards the right which is SW corner.
View of Western wing First floor shutters on the right and portion of the Northern wing on the left as seen from the North-West corner to the SW corner on the right.
View from SW corner of Southern wing Second floor column shutters on the top and the first floor jacks in place to support the first floor concreted roof slab.
View from SE corner of Southern wing Second floor column shutters on the top and the first floor jacks in place to support the first floor concreted roof slab.
View of Southern wing Second floor column shutters on the top and the first floor jacks in place to support the first floor concreted roof slab. The ramp is seen in the center of the snap
View of SE corner of Southern wing Second floor column shutters on the top and the first floor jacks in place to support the first floor concreted roof slab. The Eastern wing is seen in the right of the snap
19 Oct 2013
View of Northern wing First floor jacks in place to support the first floor concreted roof slab. Note that the foreground on which Jacob Mathew and Mohamed Jaffer are seen is level with the first floor.
View of Northern wing as seen from the pool side. Workers are putting up the supports for the Second floor columns.
Inspecting the pool area
View of the First floor of North wing as seen from the NE corner.
View of the First floor of East wing as seen from the NE corner.
View of the First floor of West wing as seen from the East wing First floor. North wing first floor jacks supporting concreted roof slab seen on the right
View of the First floor of South wing as seen from the North wing First floor.East wing first floor jacks supporting concreted roof slab seen on the left.
View of the First floor of East wing as seen from the North West corner, with East wing first floor jacks supporting concreted roof slab seen.
View of the SE corner of First floor as seen from the NW corner of First floor. The first columns of second floor south wing over reception area is seen in the middle.
View of the First floor of West wing as seen from its south end. All the first floor jacks supporting concreted roof slab have been removed and seen at the distal end.
View of the First floor East wing as seen from the SW corner of First floor. Ramp near the service lift of Kitchen area seen on the left.
View of the North wing First floor as seen from the SW corner of First floor. Dining room area seen in the ground floor.
View of the South wing of First floor as seen from the middle of West wing First floor. The first columns of second floor south wing over reception area is seen in the left, and the ramp close to the hospital lift is seen near the right.
Shutters laid for ramp from first floor roof to second floor roof, overlooking the southern range of hills.
View of the First floor East wing as seen from the second floor SW corner. The service ramp is seen near the left.
View of the North wing First floor as seen from the second floor south wing.
View of the southern range of hills as seen from the eastern side of the ramp on the south wing.
View of the First floor roofs of West on the left and North wing on the distal side as as seen from the SE corner of roof of First floor. The first columns of second floor south wing over reception area is seen nearest or proximal.
View of the southern range of hills as seen from the South eastern corner of the building.
Engineers and consultants discuss atop the first floor roof of the west wing. . The columns of second floor west wing also seen.
View from the SE corner of second floor south wing columns.
View of the SE corner of CCH building, as seen from zero ground level.
23 Oct 2013
Freshly concreted First Floor roof slab
Completed columns on the second floor
View of western pool on the left and main pool on the right as seen from the second floor
View of western pool as seen from second floor
View of main pool as seen from second floor
View of south wing second floor roof shutters as seen from second floor north wing
29 Oct 2013
Laying the steel rods for the second floor roof or presently terrace on the south wing.
Laying the steel rods for the second floor roof as seen from the east end or presently terrace on the south wing.
The steel rods of the second floor roof or presently terrace on the south wing project into the right bottom corner of the photo that snaps up the entrance of the CCH site.
Against the late evening sun, workers laying the steel rods for the second floor roof or presently terrace on the south wing.
A lone worker fastens the steel rods for the second floor roof or presently terrace on the south wing, against a backdrop of the southern hills.
Against the setting sun workers laying the steel rods for the second floor roof or presently terrace on the south wing.
Contact details:
Champion Care Homes Pvt., Ltd.,
V/529
MD's Quarters, Edalakad,
Thabore P.O.,
Pin 683577, Ernakulam District,
Kerala State, India.
Mobile number is +918281345391
Land line is +91 484 2451450
skype: emrafi